---
title: "Costing level limit has been reached or exceeded"
canonical: "https://wiki.soft1.eu/space/SKEN/643079041/Costing%20level%20limit%20has%20been%20reached%20or%20exceeded"
format: markdown
---
🌱 It is displayed in the Production Costing Levels job* (Jobs menu→ Production → Production costing).* Work as follows:

Check Doc dates. Make sure the Doc date for Product A is before any Doc date when this Product is used as Consumable. 

For example, if Product A is Produced on 07/10/2024, it should not be used as a Consumable in another Doc created on 25/10/2024.

### Message list

> Macro (contentbylabel)